Production orders now stay open until goods are received, and WIP, material ledger values, variances and BOM costs are calculated correctly.
BOM Calculate Cost prices lines with no cost
Calculate Cost now fills unpriced BOM lines from their chosen cost source (standard, moving average or last purchase price). It lists any lines it could not price, and for released BOMs it names the lines to price by change order. Production orders also pick up these prices, so planned material cost no longer freezes at zero.
Orders stay in progress until goods are received
Confirming the last operation no longer marks the order as completed, which used to block the goods receipt. The order stays In Progress until its finished goods are received.
Finished goods valued from the order's actual WIP
A goods receipt from production now values the finished goods from the material and conversion cost still held in the order's WIP, divided by the quantity still open. Partial receipts no longer take the cost of the whole order. The postings credit the same WIP accounts the order was debited on, so WIP clears to zero.
Material ledger shows value on issues again
Goods issues to production, cost centres and sales had been recorded in the material ledger at zero value since late July. They now carry their value, and stock transfers show value on each leg. Entries already recorded are not corrected.
Issued quantities on production orders now update
The issued quantity and status of each order material are refreshed after every goods issue and every reversal. The cost sheet, variance analysis and order status now reflect what was actually issued.
More accurate price and usage variances and WIP figures
Usage variance is now based on the quantity actually issued, and price variance is the remainder of the ledger variance. Cost sheet actuals are valued from the material ledger. The WIP report no longer counts tiny rounding residues as WIP.
Variant rules and size matrix limited to the right material
Variant rules and the order size matrix no longer accept another material's variants. Materials that vary on only one axis, such as size only or colour only, now get a size matrix on the order screen. The production order form also defaults the unit of measure.
Goods issue offers only stock it can actually use
For a make-to-stock order, goods issue now offers only batched stock that is not earmarked for a sales order. Availability no longer shows stock that posting then refuses. Receipts built line by line, such as opening stock, now get a batch when posted.