Public changelog

What we shipped, in plain language.

Every release to Biztimize — new features, improvements, fixes, and breaking changes — documented here, for everyone. No marketing gloss.

3.83.9

Payslips are issued automatically when payroll is posted

November 02, 2026
Production

Posting a payroll run now e-mails each employee a PDF payslip, shows it in My Workspace, and gives HR new tools to print, resend and design payslips.

Bug Fix

Payslip view and download in My Workspace

Employees' payslips now open and download correctly in My Workspace. Previously the PDF link failed with a not-found error.

Human Resources Global
Improvement

Payslip templates by employee type, with preview

On the Payslip Templates page you can limit a layout to certain employee types, mark one as the default, and load the standard layout as a starting point. You can also preview the layout as a PDF. A layout with errors is now rejected when you save it, so a mistake no longer changes payslips on posting day.

Human Resources Global
Improvement

Payslips appear in My Workspace once posted

Employees now see a payslip in My Workspace only after the payroll run is posted, which is when it is e-mailed. Before, it appeared as soon as it was approved.

Human Resources Global
New Feature

Payslips e-mailed on posting

When a payroll run is posted, each employee receives an e-mail with their payslip as a PDF and a short summary in the body. E-mailing can be switched on or off for each payroll area. Every send attempt is recorded, and HR can resend payslips.

Human Resources Global
New Feature

Payslips dialog for each payroll run

HR can open a Payslips dialog on a payroll run to see each employee's e-mail delivery status. They can also print one merged PDF of the run's payslips, filtered by employee type, department or plant.

Human Resources Global
3.82.0

placeholder

November 01, 2026
Production

HR can now see schedule coverage, manage each employee's work schedule and the default schedules, and assign defaults in bulk from one screen.

Bug Fix

Default schedules show the payroll area name

Default work schedules that apply to a payroll area used to show a blank payroll area. The area name now appears.

Human Resources Global
Bug Fix

Default covering every company can be created

A default schedule that applies to all companies, payroll areas or employee types could not be created. It can now, and a second default for exactly the same scope is refused.

Human Resources Global
Bug Fix

Defaults with zero weekly workdays are refused

A default schedule with zero weekly workdays was accepted. It is now rejected with an explanation, since it would make absence rates unmeasurable.

Human Resources Global
New Feature

Work schedule coverage overview

The new Work Schedules screen under Shift & Roster shows active headcount, coverage percentage, employees without a schedule and schedules with zero workdays. It lists who is missing a schedule, with an Assign button on each row.

Human Resources Global
New Feature

Manage employee work schedules

View every schedule as currently in force, future, ended, as at a date, or all. You can edit a schedule, end it on a date, delete it, open an employee's history, or export the list to Excel. An employee can have only one schedule on any day. If a new schedule overlaps, you are told which schedules clash. You can also end the current schedule the day before the new one starts.

Human Resources Global
New Feature

Maintain default schedules and test which one applies

A Defaults tab lets you maintain the default work schedules. A tester shows which default an employee would get and why.

Human Resources Global
New Feature

Assign default schedules to employees without one

A Backfill tab previews who would be assigned which default. You can apply to everyone or only to ticked rows. The confirmation states each default's weekly workdays, because these are used as the absence-rate denominator. Employees hired after the preview are not assigned without being shown first. Each company needs at least one default configured before this can assign anything.

Human Resources Global
3.77.0

Job-work orders: specifications, loss norms, recovery and rate cards

November 01, 2026
Production

Sub-contract orders now carry a process specification, expected output from the BOM and a rate card rate. Excess process loss is reconciled and recovered from job workers.

New Feature

Process specification on sub-contract order lines

Each sub-contract order line has a specification based on its process. Mandatory fields are checked when the order is submitted and approved. The specification prints on the purchase order and on a new job-work challan. You can copy it from an earlier order, and after issue it can only change by amendment.

Procurement Global
New Feature

Expected output and frozen loss norms from the BOM

The BOM now sets the process-loss norm for each component, and the order shows the expected output. The norm is frozen once the order leaves draft.

Procurement Global
New Feature

Job-work lot closure and reconciliation

Closed lots are reconciled against the norm. Loss is recognised only for closed lots, excess and weight gain are shown per component, and material still at the job worker is written off as loss. Each loss is valued at the recovery rate for its material group, or at the issued valuation if no rate is set.

Procurement Global
New Feature

Excess-loss recovery from job workers

A recovery proposal is created fortnightly for each job worker. The Fabric Head reviews it with reasons, and management approves it in My Approvals. The person who submitted it cannot approve it. Accounts then posts an AP debit note, and the MD can write off any part that is not recovered. A recovery working can be printed.

Finance Global
New Feature

Job worker approvals, capacity and buyer nominations

Record each job worker's approved processes, with an expiry date worked out from the approval. You can also record machines and capacity, and buyer nominations. Warnings about these need a reason, and an advisory finder suggests suitable job workers.

Procurement Global
New Feature

Rate cards with approval of deviations

Rate cards propose a rate by process, fabric, shade and lot size band, and apply a minimum lot charge. Deviations from the card and extras need the Fabric Head's approval as part of the order approval. Approved orders keep the rate they were approved at. Extras are recorded and approved but are not yet added to the PO line value.

Procurement Global
New Feature

New Job Work screen and reports

A new Job Work screen covers lots, recovery, rate cards, job worker approvals, capability and nominations. New reports show loss against norm, the recovery register and rate deviations. Reminders go out for the fortnightly recovery digest and for approvals that are about to expire.

Procurement Global
3.78.0

Job-work movements: chain transfers, direct delivery, e-Way Bill, ITC-04 and challan ageing

November 01, 2026
Production

Job-work now covers moving goods between job workers, direct supplier delivery, challan e-Way Bills, the principal's ITC-04 return and challan ageing alerts.

Bug Fix

Job workers with similar codes no longer share a location

Supplier codes such as SUP00123 and SUP00124 used to get the same job-worker stock location. The second job worker's first transfer then took over the first one's location. Each job worker now gets its own location. Locations that were already assigned wrongly are not repaired.

Procurement Global
New Feature

Direct delivery from supplier to job worker

A supply purchase order line can name the job worker and the order component it feeds. The goods are received into the job worker's location for the acknowledged quantity, which needs the receipt note, its date, the quantity and the attached file. Any billed quantity above that appears as the invoice's normal quantity difference.

Procurement Global
New Feature

Job-work challan numbers and e-Way Bill

Every goods transfer to a job worker now gets a challan number from a series per process. The challan print shows the actual from and to premises, line values and the e-Way Bill. You can generate an e-Way Bill for issue, chain and company-issued return challans. The screen says when one is required but doesn't force it, and cancelling is allowed only within 24 hours.

Procurement Global
New Feature

Reverse a job-work challan

A goods transfer to a job worker can now be reversed. A challan whose e-Way Bill is still active cannot be reversed until that e-Way Bill is cancelled.

Procurement Global
New Feature

Principal ITC-04 return

You can build ITC-04 tables 4, 5A, 5B and 5C for each GSTIN and period from your job-work documents. Validation names the failing document, and export to the portal template is refused while any row fails. Marking a period filed freezes it, and a late document goes into the next period.

Finance Global
New Feature

Challan ageing and deemed-supply list

Open challan quantity is worked out by matching receipts and returns to challans oldest first. Alerts are raised once each at 9 and 11 months and at 33 and 35 months. Lines past the limit go on a deemed-supply list showing value and tax. Nothing is posted. Stock-at-job-workers and chain-register reports are also added.

Procurement Global
New Feature

Job-work movements page and legacy challan loader

A new Job-work Movements page brings these functions together. Existing open challans can be loaded from the legacy system, with a test run before applying.

Procurement Global
New Feature

Chain receipt from one job worker to the next

A stage's output can be received at job worker A and sent straight on to job worker B against B's approved order component, in one step. The challan is issued in B's name, the batch carries over, and no journal is posted. A chain movement register lists these movements.

Procurement Global
3.79.0

Fabric roll register with QR labels

November 01, 2026
Production

Each fabric roll is now recorded at receipt with its weight and specifications, gets a QR label, and can be tracked through job work, transfers, cutting and scrap.

Improvement

Receipts checked against roll weights

A receipt or issue is refused when the roll weights do not add up to the kg posted, within 0.5% or 1 kg, whichever is larger. A partial quality usage-decision split on a lot held as rolls is refused with a message.

Inventory Global
New Feature

Fabric roll register

Each fabric roll is recorded at receipt with gross, tare and net kg, GSM, width or dia, length, shade and shade band. A new Fabric Rolls screen under Materials has tabs for the register, scanning and moving rolls, capture at receipt, inspection and grading, reports and set-up. Materials only become roll-managed when you configure them, so nothing changes for tenants that don't.

Inventory Global
New Feature

Capture rolls at receipt

Key in the rolls of a receipt by pasting the packing list, or quick-enter a count of rolls at a given kg each. Rolls can be captured against purchase-order lines and sub-contract receipts. Roll IDs come from the plant's numbering series and are never reused.

Inventory Global
New Feature

QR labels for rolls

Print roll labels at 100 × 50 mm, on A4, or as ZPL for label printers. A reprinted label is marked COPY and every print is logged. A per-lot roll list can also be printed.

Inventory Global
New Feature

Scan rolls through job work, transfers, cutting and scrap

Scan rolls onto job-work challans, returns from the job worker, store transfers, issues to cutting and scrap. A roll's status follows its location, and every roll event is recorded in its history. A roll at the wrong store, or in a state that cannot move, is refused with a reason. The roll receipt on a job-work chain passes on exactly the rolls received.

Inventory Global
New Feature

Roll grading from fabric inspection

Inspection grades each roll as A, B, seconds or rags from points per 100 sq. yd, with thresholds you can set per buyer. Grades come only from the inspection. Seconds and rags rolls stay blocked until a posted usage decision on their lot releases them.

Quality Management Global
New Feature

Roll reports

New reports show roll stock, shade band by lot, and lot-to-roll traceability, from upstream lots to rolls to cut lots.

Analytics Global
New Feature

New roll permissions and Cutting Roll Issuer role

New permissions control who can view, manage and print rolls, issue them to cutting, and grade them. A new Cutting Roll Issuer role is available. Administrators need to assign these permissions or the role to the right users.

System Global
3.80.0

P2P Performance dashboard and scheduled procurement mails

November 01, 2026
Production

A new P2P Performance page tracks seven procure-to-pay KPIs with drill-downs, and four scheduled procurement report mails keep buyers and managers informed.

Improvement

Buyers no longer get overdue deliveries twice

The existing overdue-delivery job now only raises the notification bell. The overdue email comes from the new daily scheduled mail.

Procurement Global
New Feature

P2P Performance page with seven KPIs

Procurement → P2P Performance shows indent-to-PO time, on-time delivery, price variance, rejection rate, job-worker on-time return, yield vs BOM norm and right-first-time. Each tile shows the counts behind it and says Not available, with the reason, when there is nothing to measure instead of showing 0.

Procurement Global
New Feature

Drill into the documents behind each figure

Click a KPI tile to open the documents behind it. The drill-down always matches the number on the tile.

Procurement Global
New Feature

Trends, worst suppliers, overdue deliveries and group comparison

The page adds a 12-month trend, the ten worst suppliers or job workers, deliveries overdue right now, and a comparison by purchasing group. You can filter by period, plant, purchasing group, supplier and material group, and buyers see only their own purchasing groups.

Procurement Global
New Feature

Fabric-to-cutting report and KPI settings

A Fabric-to-cutting tab reports by sales order and date range. A settings dialog lets authorised users choose the delivery grace days, the job-worker return grace days and whether price variance is compared with the last purchase price or the standard price.

Procurement Global
New Feature

Scheduled P2P report mails

Buyers get a daily 08:00 mail listing their own overdue deliveries, or "No overdue deliveries" if they have none. The Fabric Head gets a weekly job-work outstanding mail on Mondays, and a monthly KPI pack with an Excel attachment arrives on the 3rd. A Fabric-to-cutting mail is available but switched off by default.

Procurement Global
New Feature

Ask AI can answer questions about purchase order lines

On the P2P Performance page, Ask AI can answer questions about PO lines, such as open value by supplier or overdue lines. It applies the same permission and scope as the page.

Analytics Global
3.81.0

Order Book: every sales order line with every order field

November 01, 2026
Production

A new CRM Order Book report lists every sales order line with all its order details, with grouping, pivot reports and Ask AI.

New Feature

Order Book report

CRM now has an Order Book page that shows every sales order line together with every field of its order. Important columns load first, and the other columns, including the picture, are in the column chooser and load only when you show them.

CRM Global
New Feature

Group the Order Book on the server

Switch between Lines and Grouped views. You can group by parent material (variants roll up), customer, order, season, order type, merchandiser, sales person, or order or delivery month. Each group is split by unit and shows total and pending quantity and the average selling price in INR, net and before tax. Click a group to see its lines.

CRM Global
New Feature

Saved layouts and pivot reports for the Order Book

You can save the Order Book's columns and its Lines or Grouped mode as a layout. Pivot Analysis also supports saved Order Book reports.

CRM Global
New Feature

Ask AI on the Order Book

Ask questions about the data the Order Book is showing. Answers to repeated questions are cached until the data changes. You can save any answer as a grid layout or a pivot report. Outside the development environment, Ask AI needs an AI key set up for your company.

CRM Global
New Feature

Excel export of the Order Book

You can export the Order Book, in both Lines and Grouped views, to Excel.

CRM Global
3.83.0

Gauge logo on the sign-in page, browser tab and app icons

November 01, 2026
Production

The sign-in page, browser tab and installed app now show the new Biztimize gauge logo, with a navy theme colour.

Improvement

Updated installed-app icons and navy title bar

The installed app (PWA) icons on desktop, Android and iOS now use the new gauge logo, and the app title bar is navy. If you already installed the app, reinstall it to see the new icon right away.

System Global
New Feature

New browser tab icon

Biztimize now has its own icon in the browser tab. Before this, the tab showed no icon.

System Global
New Feature

New gauge logo on the sign-in page

The sign-in page now shows the Biztimize gauge logo above the wordmark. On phones, the logo appears on a navy tile and the tagline now reads "Optimize your Business".

System Global
3.76.0

Vendor controls, PO delivery schedules, Import LCs and confirmations

October 31, 2026
Production Breaking changes

Procurement and payables gain GSTIN verification, approved bank-account changes, split PO delivery dates, an Import LC register and vendor balance and stock confirmations.

New Feature

Supplier GSTIN checked against the GST registry

A supplier's GSTIN is verified when you save, on demand, and re-checked monthly. A cancelled or suspended GSTIN blocks activating the supplier and shows a warning on purchase orders. Without a GST provider set up, only the format is checked and the supplier shows as Not verified.

Procurement Global
New Feature

Udyam / MSME details on the vendor master

Vendors now have an Udyam number, MSME category and certificate. The MSME 45-day outstanding report now uses the Udyam category. It applies the 45-day rule only to micro and small suppliers. Suppliers with an MSME number but no category are listed separately as Not captured.

Procurement Global
New Feature

Delivery schedule lines on purchase order lines

A PO line can be split into several delivery dates. Receipts close the schedules oldest first, and the PO's delivery date follows the earliest open schedule. Overdue and adherence tracking works per schedule, and the PO print lists the schedules. An issued PO is amended as a new version, which resets its approval.

Procurement Global
New Feature

Import Letter of Credit register

A new register tracks import LCs. You can link POs up to the LC amount and record drawings within the available balance and before expiry. Accepting a drawing moves the invoice's due date to the maturity date. LCs show their stage and close automatically. The due payables list shows which invoices are paid through an LC.

Procurement Global
New Feature

Balance and job-worker stock confirmations

You can run vendor balance or job-worker stock confirmations, frozen as of a chosen date. Letters are mailed with a reply slip, and replies are recorded as Agreed or Disputed. Differences are listed but never posted. Reminders go out on day 7, and a supplier with no reply after 15 days is marked No response.

Procurement Global
Security Update

Supplier bank-account changes need approval

A new or changed supplier bank account is now a request. It needs the account number entered twice, the IFSC and a cancelled cheque. The new Senior Accounts Manager role approves it in My Approvals, and the requester cannot approve their own request. Payment proposals, bank files, payment advices and the due list use approved accounts only. A supplier with a pending change is excluded from proposals, and the reason is shown. Existing accounts stay active, but Accounts should review the migrated list.

Procurement Global Breaking change
3.76.1

Fixed saving fixed assets with empty optional fields

October 31, 2026
Production

Editing and saving an asset no longer fails when fields like responsible person, floor, room or status details are blank.

Bug Fix

Asset edit no longer rejects blank optional fields

Saving an existing asset with an empty responsible person, floor, room or status details used to fail with a "may not be null" error. These fields can now be left blank and the asset saves normally.

Finance Global

Want a walkthrough of what's new?

We run monthly release briefings for customers — what shipped, what changed, what's next. Bring your team.